. . . . . . HOW TO INSTALL TURFACE MVP . . . . . .
(Regulation High School Baseball or Softball)
A. 3 TONS OR MORE:
Moisten the skinned area. Spread Turface MVP bags evenly throughout the skinned area to be renovated. (There is approximately 10,000 sq. feet or more in skinned area.)
Rototill the Turface MVP into the existing infield mix to a depth of 3" to 4". Apply water.
Roll the infield with a one ton roller or a hand roller. This helps speed up the settling process, allowing the field to firm up more quickly. If you are not able to roll, it will take longer to firm. Continue to apply more water after the field has dried.
Slowly drag the infield twice with a drag mat. This will loosen the surface to a desired consistency and level any visible low spots. After, rake or sweep all edges to remove any loose material from the turf. This will prevent any lips from forming.
B. 1 - 3 TONS:
Lightly moisten the skinned area to loosen the surface in preparation for mixing the Turface MVP into the soil. Do not soak.
Spread 2-3 tons of Turface MVP, concentrating on traffic areas. Level the material spread before mixing.
Nail drag the infield twice, working the Turface MVP into the top 1 - 1.5 inches of the playing surface. This will ensure that the Turface is incorporated evenly.